Classroom 125 to be converted to New Main Office. New Entrance Vestibule adjacent to new Main Office. Existing Main office to be converted to a Classroom. Alternate – Renovate & expand Nurses Office (adjacent to existing Main Office). New First Floor Canopy. Remove Radiator on 2nd Floor Stairway. Work includes but is not limited to selective demolition, CIP concrete, cast stone sills, structural steel, steel decking, cold-formed metal framing, metal fabrications, pipe & tube railings, column covers, rough carpentry, sheathing, plastic-laminate-clad cabinets, thermal insulation, aluminum composite wall panels, EPDM roofing, sheet metal flashing & trim, roof accessories, joint sealants, HM doors & frames, flush wood doors, access doors & frames, bullet resistant doors, windows & frames, aluminum framed entrances & storefronts, aluminum windows, door hardware, bullet resistant polycarbonate security glass, non-structural metal framing, gypsum board, tiling, resilient base & accessories, resilient sheet flooring, resilient tile flooring, epoxy terrazzo flooring, interior painting, toilet & bath accessories, cubicle curtains, bullet resistant fiberglass, bullet resistant partitions & equipment, fire protection, plumbing, HVAC, electrical work and site excavation. This project is valued at approx. $2,000,000.